Not necessarily. A lower overall success rate can be caused by a harder workload mix even when every comparable task group improved. Keep the raw rate because it is what users experienced, then calculate a fixed-mix diagnostic rate to decide whether the urgent problem is changed work, changed within-group delivery, or both.

This guide is for an authorized workflow that already records planned jobs, a shared validator, and a deadline. Here, “success” means a planned job produced the correct result on time—not an HTTP response or a provider request-level claim. The small download is invented teaching data, makes no network request, and is not an IPHTML or supplier benchmark.

One operational decision: protect delivery, then find what changed

Suppose a weekly dashboard falls from 90.5% to 59.1%. Do not automatically renew, switch, or announce that a provider deteriorated. First retain the actual 59.1% rate as the delivery harm to investigate. Then ask whether the planned work moved into harder, fully observed strata. A stratum might be a predeclared target class, region, validator version, session mode, or time band—only use dimensions that were defined before comparison and are meaningful to the job.

  1. Freeze the contract: the scheduled-job ledger, correct-and-on-time validator, deadline, retry policy, strata, and observation windows. A known zero-success stratum is valid evidence when it has planned jobs.
  2. Confirm every frozen stratum appears in both periods with a positive planned-job denominator. A new or absent stratum, zero denominator, missing job row, or changed validator is HOLD, not a number to fill in.
  3. Report raw delivery for each period: good planned jobs / all planned jobs. This stays in the operational dashboard because it describes actual users' scheduled work.
  4. Apply the before period's task shares to both periods' within-stratum rates. Name those weights and keep them unchanged for this comparison.
  5. Decompose the raw change using those baseline weights. Inspect the strata with the largest volume shift and the weakest current delivery. Fix scheduling, queueing, target/validator changes, or access design as the evidence supports; do not assign cause from the aggregate alone.

The CDC describes direct standardization as applying group-specific rates to one standard distribution, and cautions that the adjusted result is a relative index rather than the actual measure. This is an engineering adaptation of that arithmetic: the fixed-mix number is a diagnostic counterfactual, while raw delivery remains the observed experience.

A fully observed Simpson reversal

There are two predeclared task classes. A is easier; B is harder. All cells are observed—this is not a missing-coverage example.

PeriodA: correct/on-timeB: correct/on-timeActual overall
Before855/900 = 95.0%50/100 = 50.0%905/1000 = 90.5%
After96/100 = 96.0%495/900 = 55.0%591/1000 = 59.1%

A improved by one percentage point and B by five, yet the aggregate fell 31.4 points because work moved from 90% A / 10% B to 10% A / 90% B. That apparent reversal is a composition effect, often called a Simpson-type reversal. It is not evidence that a provider caused either within-class improvement; changed targets, traffic, client releases, validators, queues, or unmeasured conditions can also differ.

Use one disclosed reference mix

Choose weights that answer a real planning question. This example freezes the before mix (A 90%, B 10%) because the operator wants a “what if task proportions had stayed the same?” diagnostic for the after period. The standardized after rate is:

0.90 × 96.0% + 0.10 × 55.0% = 91.9%

Compared with the 90.5% before rate under the same weights, that is +1.4 percentage points. Under this baseline-weight decomposition, actual change is -31.4 points = +1.4 points within-stratum rate effect + -32.8 points mix effect. Reversing the order produces different components (+4.6 and -36.0 points) but the same total, so name the convention. Do not present 91.9% as what users received; they received the raw 59.1% outcome in this synthetic after period.

Reproduce the check offline

Download the standard-library Python fixture. It contains only the four invented counts above, no files, credentials, targets, proxy activity, or network calls.

python3 proxy-success-rate-workload-mix.py

Its exact output is:

synthetic fixture only; no network requests
outcome=correct and on-time planned jobs; weights=frozen before workload mix A=90.0%, B=10.0%
before: raw=90.5% (905/1000); A=95.0% (855/900); B=50.0% (50/100)
after: raw=59.1% (591/1000); A=96.0% (96/100); B=55.0% (495/900)
after at before mix=91.9%; actual change=-31.4pp; within-stratum rate effect=1.4pp; mix effect=-32.8pp
DECISION (illustrative default): investigate workload mix and protect actual delivery; do not call this causal provider improvement

The fixture rejects a missing/new stratum and a zero planned-job denominator. It accepts zero successes when planned jobs are positive. It checks arithmetic, not truth: reconcile scheduler records, attempts, and validator version before acting. Small fixtures do not supply statistical certainty.

Turn the result into a safe follow-up

Open two work items: one for the largest mix increase into low-delivery B, and one for any within-stratum decline. In this fixture, misses rose from 95 to 409 and B accounts for 405 of the 409 current misses (A fell from 45 to 4; B rose from 50 to 405). That makes B the first operational queue, subject to business criticality—not proof of cause. For each, retain job IDs, planned count, good-on-time count, deadline, validator version, client release, queue time, and authorized target context. Compare official APIs, licensed feeds, manual verification, or a reduced permitted run where they fit better; never use retries or route changes to evade a destination's controls.

For the broader denominator and evidence contract, use the proxy reliability scorecard. For a fixed trial allocation before the next comparison, use the representative proxy trial plan; for a deadline-versus-completed-only conflict, see the timeout benchmark guide.

Next step: when an authorized workload still needs regional public observation after considering official and manual alternatives, compare its declared session, location, and validation needs with residential proxy options. Bring the redacted job ledger and this decomposition to the contact page for a fit discussion. This is evaluation guidance, not a performance, availability, or suitability promise.

Sources checked 2026-11-26: CDC: age adjustment; CDC surveillance guidance on direct standardization; Hernán, Clayton and Keiding on Simpson's paradox.